The Texas Supreme Court recently denied a petition for review of the Amarillo Court of Appeals’ opinion in State v. Riemer, 2025 WL 1757924 (June 25, 2025). This ends some 35 years of litigation over the boundary of the Canadian River below Sanford Dam.
The Canadian River begins in the Sangre de Cristo Mountains of New Mexico and runs across the Texas Panhandle, creating the Canadian River breaks. It is a “braided river,” made of many small, shallow channels that split apart and rejoin around temporary sandbars, so from the air it looks like a braid or tangle of interwoven strands. A braided river is wide and shallow and its channels change with flooding events. Its banks may be far apart.
In 1965 the US Corps of Engineers completed construction of the Sanford Dam on the Canadian River, creating Lake Meredith, northeast of Amarillo. All river flow below the dam stopped for a stretch of some 40 miles, except for runoff that entered the river below the dam. I believe it is correct that, since its construction, no water has flowed through the dam from the lake. Before the dam, the riverbed below was an average width of some 3,400 feet. After completion of the dam, vegetation began to cover most of the riverbed.
The State of Texas owns title to the bed of navigable streams. Beginning in 1937, the Texas General Land Office leased the bed of this segment of the Canadian River to J.M. Huber Corporation. At the time of the first litigation over title to the riverbed, Huber operated twenty-one oil wells situated in the riverbed. The riverbed was also used by off-road vehicles for recreational purposes.
Questions over the boundary of the riverbed segment downstream of Sanford Dam arose beginning in the 1980’s. Huber commissioned Darrell Shine, a Texas Public Land Surveyor, to survey the boundaries of the river in the early 1980’s. He filed his survey with the GLO in 1982, and it was accepted by the GLO as depicting the river’s boundary. The survey located the river boundary as it had existed when Sanford Dam was completed. In 1985, the GLO commissioned its own survey of the riverbed. Based on a Texas Attorney General’s opinion, the GLO determined that the erection and closure of the dam did not change the river’s boundary; directed the surveyor (again Darrell Shine) to locate the “historical gradient line prior to any changes in the river cause by dams or other man-made alterations.” Landowners on both sides of the river disputed this conclusion, and thus began the long dispute over some 13,000 acres of riverbed lands below the dam.
In 1989 the Texas Legislature authorized the landowners to sue the State over the river boundary, and the landowners brought suit. They submitted their own boundary survey which placed the boundary in the small channel where runoff into the river trickled down below the dam when rains occurred. The trial court held that the landowners’ survey was the correct one. The case made its way to the Texas Supreme Court, Brainard v. State, 12 S.W.3d 6 (Tex. 1999), which ruled for the landowners.
The legal issue in Brainard was whether the erection of the dam changed the boundary of the river. The State argued that artificial structures should not change the State’s ownership, and that the sudden cessation of flow in the river was an “avulsive” change which would not change the river’s boundary, whether natural or artificial. The Court disagreed with both arguments. Thus the State lost title to some 13,400 acres of land in the (former) riverbed.
But that was not the end of the story.
After the Supreme Court decided Brainard, some of the landowners in the six-mile stretch of river below the dam sued the State alleging that the State had unconstitutionally taken their mineral and royalty rights in the former riverbed by continuing to lease to, and collect royalties from, Huber on riverbed leases while Brainard was being decided. Jimmy Glen Riemer sued for damages asserting inverse condemnation of the minerals adjacent to his land in 1999, and other landowners later joined the suit. In 2024, the trial court awarded the plaintiffs $531,231.36 in damages for taking the plaintiffs’ minerals.
In State v. Riemer, the Amarillo Court of Appeals reversed the trial court’s award and ruled in favor of the State. The court held that the plaintiffs had waited too long to bring their suit. The issue on appeal was what statute of limitations should apply to the inverse condemnation claims. Plaintiffs claimed the 25-year limitations statute applied; the State said the 10-year statute should apply. No statute of limitations expressly mentions suits for inverse condemnation, so courts apply statutes of limitation related to adverse possession claims by analogy. The 10-year statute, Tex.Civ.Prac.&Rem. Code Section 16.026, provides that “a person must bring suit not later than 10 years after the day the cause of action accrues to recover real property held in peaceable and adverse possession by another who cultivates, uses, or enjoys the property.” Because the plaintiffs’ suit was brought more than 10 years after the dam closed, and more than 10 years after the Shine Survey was submitted to the GLO, their cause of action accrued more than 10 years before he filed suit, and their claims were barred.